The RTTS™ packer is a full-opening, hookwall packer used for testing, treating, and squeeze cementing operations. In most cases, rtts packer in drilling the tool runs with a circulating valve assembly.

The packer body includes a J-slot mechanism, mechanical slips, packer elements, and hydraulic slips. Large, heavy-duty slips in the hydraulic holddown mechanism help prevent the tool from being pumped up the hole. Drag springs operate the J-slot mechanism on ≤ 3 1/2-in. (88.9-mm) packer bodies, while larger packer sizes≥ 4-in. (101.6 mm) use drag blocks. Automatic J-slot sleeves are standard equipment on all packer bodies.

Features and Benefits

  • The full-opening design of the packer mandrel bore allows large volumes of fluid to pump through the tool. Tubing-type guns and other wireline tools can be run through the packer.
  • The packer can be set and relocated as many times as necessary with simple tubing manipulation.
  • Tungsten carbide slips provide greater holding ability and improved wear resistance in high-strength casing. Pressure through the tubing activates the slips in the hydraulic holddown mechanism.

RTTS™ Packer Specifications

[wpdatatable id=13]

Circulating Valve

The circulating valve is a locked-open/locked-closed valve that serves as both a circulating valve and bypass. The clearance between the packer (or any hookwall packer) and the casing ID is relatively small. To reduce the effect of fluid-swabbing action when the tool is run in or pulled out of the hole, a packer bypass is generally used.

Features and Benefits

  • The valve can be locked closed when the packer is unset to reverse fluid around the bottom of the packer.
  • The tool’s full opening allows tubing type guns and other wireline equipment to pass.

Circulating Valve Specifications

[wpdatatable id=14]

Safety Joint

The safety joint is an optional emergency back off device. The safety joint releases the work string and tools above the packer if the packer becomes stuck during operations. The design of the safety joint makes unintentional operation difficult.

Features and Benefits

  • Positive sequence of operation helps prevent premature release.
  • Tools above it can be retrieved when string is stuck.

 

Safety Joint Specifications

Size in.

OD in.

ID in.

Connection

Tensile Rate Lb.

Burst Rate psi

Collapse Rate psi

5 1/2- 6 5/8

4.06

2

2 3/8 EU

127,400

10,200

13,000

7-7 5/8

5

2.44

2 7/8 EU

148,800

12,300

10,900

8 5/8- 13 3/8

6.12

3.12

4 1/2 IF TJ

271,900

13,800

10,400

Hydraulic Hold-Down Mechanism: Principles and Physics

While the mechanical slips prevent the packer from moving downward under the weight of the tubing and the setting force, the RTTS packer faces a critical challenge during high-pressure stimulation or squeeze cementing: the “Piston Effect.”

When high pressure is applied below the packer (inside the tubing and below the element), and the annular pressure above the packer is low, a significant upward force is generated.

Sealing Element Technology and Selection

The sealing integrity of the RTTS packer relies on a multi-durometer element package. A standard configuration employs a three-element system:

  1. Upper Element (Hard): Typically 80-90 Shore A hardness. Prevents upward extrusion of the softer center element.
  2. Center Element (Soft): Typically 70 Shore A hardness. This provides the primary seal, flowing into casing irregularities, pits, and corrosion patches.
  3. Lower Element (Hard): Typically 80-90 Shore A hardness. Prevents downward extrusion.

Material Considerations for Hostile Environments

The standard Nitrile (NBR) elements are suitable for many applications, but modern wellbores often require advanced elastomers:

  • Standard Service: Nitrile. Temp limit: ~250°F (121°C). Good for standard oil/water/mud. Poor resistance to high aromatics.
  • Sour Service (H2S): Hydrogenated Nitrile (HNBR) or Viton (FKM). HNBR offers excellent mechanical strength and resistance to H2S up to ~300°F (149°C).
  • High Temperature/Steam: Aflas (TFE/P) or high-grade Viton. Required for steam injection or deep gas wells where temperatures exceed 400°F (204°C). Note that Aflas has poor elasticity at low temperatures, so setting it in a cold shallow well requires caution.

Detailed Operational Procedures

Successful operation of the RTTS packer requires adherence to specific protocols during the Run-In-Hole (RIH), Setting, and Retrieving phases.

1. Preparation and Make-up

  • Casing Conditioning: Before running the RTTS, a casing scraper run is highly recommended. Cement sheaths, scale, or paraffins on the casing wall can prevent the slips from biting or the elements from sealing.
  • Gauge Ring Run: A gauge ring and junk basket should be run to ensure the casing ID is free of obstructions and to collect any debris that could foul the J-slot.
  • Tool Inspection: Verify the J-slot pin condition. Worn pins can cause the tool to unset prematurely or fail to set. Check drag blocks/springs for proper tension; they must provide enough friction against the casing to allow the mandrel to rotate for J-slot manipulation.

2. Running In Hole (RIH)

  • The tool is run with the circulating valve open. This prevents the “swabbing” effect (pulling formation fluids into the wellbore due to suction) and prevents “surging” (forcing fluid into the formation due to piston action).
  • Speed: Run at a moderate speed (e.g., 1 min per stand). Excessive speed can damage the rubber elements as they rub against the casing wall.
  • Rotation: Avoid right-hand rotation while running in, as this is the setting motion for the tool.

3. Setting the Packer

The setting sequence involves three distinct actions: Motion, Rotation, and Compression.

  1. Depth Control: Reach the desired setting depth.
  2. Pick Up: Pick up the workstring to the neutral point plus a few feet to position the J-pin in the upper part of the slot.
  3. Rotate: Rotate the tubing 1/2 to 3/4 turn to the right (at the tool). The drag blocks hold the packer body stationary relative to the casing, allowing the mandrel to turn. This moves the J-pin from the locked track to the setting track.
  4. Slack Off: While maintaining the right-hand torque (to ensure the pin doesn’t slip back), slack off the tubing weight.
  • The J-pin guides the mandrel down.
  • The mechanical slips are forced outward by the cone.
  • Once the slips bite, continued weight compresses the rubber elements.
  1. Weight Requirement: A minimum set-down weight is required to pack off the elements. This is typically calculated as:

rtts packer formule

Example: For a 7-inch packer, approximately 25,000 to 30,000 lbs of slack-off weight might be used to ensure a high-pressure seal.

4. Closing the Circulating Valve

Once the packer is taking weight:

  • Standard RTTS Circulating Valve: Often closed by rotation or integrated into the setting sequence. If it is a separate “Safety-Seal” type valve, it may require annular pressure or specific manipulation.
  • Ensure the valve is closed before beginning pumping operations.

5. Unsetting and Retrieving

  1. Equalization: This is the most critical step. Never attempt to unseat a packer with differential pressure across it. Open the circulating valve first to equalize pressure between the tubing and the annulus.
  2. Release: Pick up the workstring.
  • The upward motion pulls the cone out from under the slips.
  • The slips retract (spring-loaded).
  • The element package relaxes.
  • The J-pin automatically guides itself back into the “locked” or “running” slot.
  1. POOH (Pull Out Of Hole): Once the tool is free (indicated by a return to string weight), pull out of the hole. Allow time for fluid to drain from the tubing if the circulating valve is not fully functioning.

Specific Applications and Case Studies

The RTTS packer’s versatility makes it the tool of choice for several distinct operations.

A. Squeeze Cementing Operations

The RTTS is the industry standard for remedial cementing (squeeze jobs) due to its ability to reset multiple times and hold pressure from below.

  • Scenario: A water-producing zone needs to be isolated in a 7-inch casing.
  • Procedure:
  1. The RTTS packer and a circulating valve are run to depth, just above the perforations.
  2. Circulation is established to clean the perforations.
  3. The packer is set, and an injection rate into the formation is established (Water Feed Rate).
  4. The packer is unset, and the tool is pulled up above the cement top calculation point.
  5. Cement slurry is spotted across the perforations.
  6. The packer is pulled up to the “squeeze depth” (safe distance above cement top) and set.
  7. Squeeze pressure is applied. The hydraulic hold-down prevents the packer from unseating as pressure builds.
  8. Reversing Out: After the squeeze is obtained, the circulating valve is opened, and the packer is unset. Excess cement in the tubing is reversed out by circulating fluid down the annulus and up the tubing. The full-opening bore of the RTTS minimizes friction during this reverse circulation.

B. Acidizing and Stimulation

In carbonate reservoirs, the RTTS is used to place acid strictly into the pay zone.

  • Zonal Isolation: By setting the packer, the operator protects the casing above the packer from the corrosive acid.
  • Bullheading: Acid is pumped down the tubing. The hydraulic hold-down buttons engage as soon as tubing pressure rises, keeping the tool anchored.
  • Swabbing: After the acid job, the full-opening bore allows for swabbing tools (wireline jars, swab cups) to be run through the packer to kick off the well and flow back the spent acid.

C. Casing Leak Detection (Search and Discovery)

When a casing leak is suspected but the depth is unknown, the RTTS is used in a “leap-frog” method.

  1. Run the packer to the bottom of the suspect interval.
  2. Set packer. Pressure up the annulus. If it holds, the leak is above the packer.
  3. Unset, move up 500 feet, reset, and test again.
  4. This process isolates the leak interval efficiently without tripping out of the hole.

Troubleshooting and Field Contingencies

Even with robust design, downhole conditions can cause operational issues.

Problem 1: Packer Fails to Set

  • Cause A: Insufficient Friction. If the drag blocks/springs are worn, the body rotates with the mandrel, preventing J-slot indexing.
  • Remedy: Run drag blocks for larger casing weight or replace springs.
  • Cause B: Debris in J-Slot. Silt or sand can fill the J-slot track.
  • Remedy: Reciprocate the pipe (up and down) vigorously while rotating to wash out the debris.

Problem 2: Packer Fails to Unset

  • Cause A: Differential Pressure. The valve didn’t open, or the formation is taking fluid, creating a vacuum below.
  • Remedy: Apply pressure to the annulus to equalize, or wait for formation pressure to stabilize.
  • Cause B: Solids Settling. Sand or cement may have settled on top of the tool (above the slips).
  • Remedy: Maintain tension and apply torque. If a safety joint is present, this is a last resort to recover the string.
  • Cause C: Vulcanization. In high-temp wells, elastomers may bond to the casing.
  • Remedy: Work the pipe with tension and slight rotation to break the bond.

Problem 3: Leaking Seal

  • Cause: Damaged element or casing wear.
  • Remedy: Unset, move the packer a few feet to a new depth (to avoid the same pit/joint), and reset with slightly higher weight.

Maintenance and Redress Guidelines

The longevity of the RTTS packer depends on proper shop maintenance.

  1. Disassembly: Complete breakdown of all sub-assemblies.
  2. Cleaning: All metallic parts must be sandblasted or chemically cleaned to remove cement, acid residue, and scale.
  3. Visual Inspection:
  • Mandrel: Check for erosion or washouts, especially near the circulating ports.
  • Slips: Inspect wicker teeth. If flattened or chipped, they must be replaced. Carbide inserts should be checked for cracks.
  • Drag Blocks: Measure the OD. If they are below the minimum tolerance for the casing weight range, they will not provide enough friction.
  • J-Slot: Inspect the track edges. Rounded edges can cause the pin to jump tracks, leading to operational failure.
  1. Reassembly:
  • Use high-quality O-rings and backup rings.
  • Apply appropriate thread dope and grease to moving parts (especially under the slip cone).
  • Testing: A pressure test in the shop (using a test stump) is recommended to verify internal seal integrity before shipping to the rig.
Iran’s upstream oil and gas market includes more than state-owned field operators. Private companies, publicly listed contractors, holding-affiliated businesses and specialized oilfield service providers participate in exploration and production, drilling, well construction, directional drilling, MWD/LWD, completion and equipment supply.
This guide maps Iran’s upstream oil and gas sector through NIOC and its major production, drilling and development companies. It explains the roles of NISOC, POGC, IOOC, AOGPC, KEPCO, NIDC and PEDEC and shows how these organizations fit within the upstream industry.